A whole lot of nothing left in the to do section
Well apart from the 3 tasks (one of which is epic) in the in progress section.
Vault Phase 3 has been renamed to Vault Phase 2b.
Don’t you guys think the PARSEC academical review takes too long?
There is still “Vault - Phase 3” on Task level board · GitHub, and I’m still confused by Github.
this will include farming, so whats confusiing?
It is not updated as it should. But “Vault - Phase 3” is “To Do” so nothing wrong.
There is no way we can speed it up or stop it being published. It’s in the hands of the administrators and peer reviewers. I have heard nothing about it. Tbh it is of almost zero priority for me at this time.
Accolades for the strategic wisdom of focusing engineering resources on PARSEC prior to release, making it available for peer review, and aligning the inherent lead time of that with the remaining engineering work that is within your control.
Having a few years of critical component concept and code in the wild by a 1.0 should do much for early growth of the network.
If you have an experience about submit lecture to journal. It is not too long. It is generally takes 1~2 years. They maybe underdo reveiw and feedback process.
Typically, it takes a 12 to 18 months depending on the journal. Does anyone know which journal and when it was submitted?
Hopefully it’s sufficiently soft-proven in various tests/nets before then!
But can take a lot longer @gouda123 as has been mentioned before.
See below:
Academics run at their own pace. Not in the control of Maidsafe
The academics are probably following the updates
… and buying MAID cheap while they can
The amount of activity in the maidsafe repos is kinda exciting
routing almost ready for fleming testnets just few more tasks.
First testnet tomorrow?